Installation and Notes
1.It is not allowed to roll,throw or hit the engineered stone during the transportion and handing for it may cause the hidden crack or damage.Keep the engineered stone outdoors from rain and snow.
2.Keep the cement mortar of proper humidity,for the excessively wet mortar may:
a.Produce a layer of moisture film,and obstruct the firm adhesion of the engineered stone with the cement sand.
b.Obstruct the evaporation of the moisture under the slab.In such case,the moisture under the slab will keep on alkalization with the cement,and cause the rake angle and even the burst of the slab by crosion.
3.The cement mortar must be stirred and mixed evenly,for the unmixed mortar of poor structure may cause the poor adhesion,and crack and damage the engineered stone slab loaded.
